Oswego Hospital |
 |
|
| |
|
|
 |
| |
A unique challenge for Ridley
Electric was to install a new 3000 AMP electric service at the hospital in
Oswego, NY. The service, is complete with new switchboard and power feeders
connected to new and existing loads. Additionally, Ridley Electric
installed a 3000 AMP emergency switch board and wired it to (3) 600 kW
emergency generators and over (30) transfer switches. The project
incorporates thousands of feet of conduit and wire to connect it all. The
picture at the right is part of the conduit network... |
 |
|
| |
|
Click here for the BIG
picture |
|
| |
|
|
|
|
New Venture Gear,
Syracuse, NY |
|
| |
The
task seemed unobtainable, but the Ridley Electric team pulled together to get the
job completed on time and under budget!
|
|
| |
|
New
Venture Gear is a division of the Chrysler Corporation
located in Syracuse, NY. In 75 days we installed complete
electrical services to the new
100,000 sq. ft. addition. |
|
| |
The
Job included over 335 light fixtures. |
|
|
| |
|
Installation
of over 900 ft. of cable tray. |
|
| |
A
New 15kV double ended substation and the installation of a fire alarm system,
evacuation system, and connection of all the roof top and exhaust fan
units. |
|
|
| |
Click
a photo above to see larger pictures. |
|
 |
Carrier-CC-1
Laboratories Relocation Syracuse, NY |
 |
 |
 |
The
project consisted of 4 distribution systems 480V, 240V, 120V and
50hz into the plant. In order to accomplish this task there was
extensive outdoor substation work, the installation of a 50hz distribution system from an existing 500
kw, 50 hz motor generator set,
and the installation of 3 existing 40 HP motor generator sets along with
their associated starters and controls. |
 |
 |
The
substation work included the relocation of two 1500 kVa, 13.2 kV 480/277
volt outdoor unit substations with primary switches and power breaker
secondaries, and the installation of an outdoor double ended substation
with two 2 mVa 13.8 kV to 480/277 volt transformers, primary switches, and
secondary breaker sections. |
 |
 |
 |
 |
These
substations were fed with two 15kV interlocked armor overhead cables in an
outdoor trestle system built by Ridley Electric that spanned over 700
ft. The inside work consisted of an elaborate cable tray system for
Carriers low voltage systems, consisting of over 2,600 ft. of cable
tray. The tray system extends to panel boards, switchboards, MCC
section and bus ducts for various electrical equipment. |
 |
| |
From
these distribution centers we extended over 30,000 ft. of conduit, 16,000
ft. of 500 MCM interlocked armor cable and 67,000 ft of wire to relocated
test stands, cranes and mechanical equipment. The Ridley Electric Team
performed all of this work in four months to meet Carrier deadline dates. |
 |
|
 |
Click on any photo above to see a page of
Carrier photos. This new page may take some time to load if you are using a slow Internet connection. |
 |
 |
Hancock International Airport - Control Tower |
 |
 |
 |
Complete electrical installation in new 120 ft. Air Traffic Control Tower. Installation included over 5 miles of airport wide duct banks and control wire systems. |
 |
 |
New systems installed included power distribution, harmonic system, UPS system, and generator system. |
 |
 |
 |
 |
Ridley Electric also installed an integrated fire alarm and security system with card access. |
 |
 |
Click on any photo above to see a page of Airport Photos. This new page may take some time to load if you are using a slow Internet connection. |
 |
 |
Anheuser-Busch, Jacksonville Fla. |
 |
 |
This is an ongoing
project that includes many facets. One is the removal of three existing
depalletizers and installation of three new depalletizers, while maintaining
current operations. This job required the modification of interfacing
equipment and the upgrade of all existing computer controls, fiber
optic communications, and conveyor modification, again, while keeping the brewery 100% operational.
Another part of the project required powering and controlling three remote 1000' deep
wells, Two one million gallon storage tanks, the Bioway Waste Control system
(imported from Sweden) and connecting automatic pH & chlorination
monitor and adjustment systems.
Installation of wiring, tubing, and Flex
IO controls for hundreds of other valves and devices, motors and nano
filters is also being completed
This project will provide all
the water necessary for brewery operations.
|
 |
 |
Oswego County Energy Recovery Facility |
 |
 |
Design/Build control systems for facility operation incorporating new emission systems. Computers/Modicon PLC and MMI programming was developed by Ridley Electric Co. |
 |
 |
Turning Stone Casino, Special Events Complex |
 |
 |
The complex includes a 4,000 person Banquet Hall, new Convention Center and
Theater. This project included state of the art dimming system for all lighting, a combination of fiber optic, cold cathode, neon and decorative 20 ft diameter - 1,500 lb. chandeliers. Installation also included a new addressable fire alarm system. Entire project is on a fast track and must be complete within 7 months. |
 |
 |
State University of New York Health Science Center |
 |
 |
Complete renovation of main hospital electric distribution systems. Work included 2 - 7.5 MVA 34.5KV transformers and 5 KV unit substations. Work was accomplished with Ridley scheduling to maintain electric service for the 24/7 hospital. |
 |
Additional projects are in progress around
central NY, FL., NH, and VA. No project is too large or complex for
Ridley Electric. Contact Ridley Electric if you would like us to
quote your next project.
|